Modern Railway Systems https://www.modrailsystems.com/Areas/CMS/assets/img/logo.svg 8201 Southpark Lane
Littleton, CO 80120
720.542.3325

NICTD Double Track

Bettering rail infrastructure across Northern Indiana.

About the Project

This project involved adding 16.9 miles of second track to Northern Indiana’s commuter rail system. The enhancements included constructing four new bridges, eight platforms, parking facilities, and replacing the single street-running tracks in Michigan City with two new, separate ballasted tracks.

MRS’ scope included designing the signal and communications systems, as well as furnishing, installing, and testing the communications systems on an electrified system. This work spanned 155 locations across three segments, ensuring comprehensive coverage and functionality.

The project encompassed installing a control point, crossings, signal houses, and Siemens GCE 5000s with PSO cases to activate the crossings. Additionally, it included configuring five hand-throw/electric lock cases and six cantilevers for both crossings and signals. The team also installed 10 fiber communication houses and equipped 4 platforms with cameras, TVMs, speakers, and VMS signage to create a modern, efficient network that meets NICTD’s needs.

Quick Facts

Location

Gary to Michigan City, IN

Project Type

Passenger & Freight Rail

Delivery Method

Design-Build

Year Completed

2024

Project Owner

Northern Indiana Commuter Transportation District

Region

Central

/

Discover the difference the right partner can make.