Amtrak West Phase I
Collaborating to ensure mutual success.
Collaborating to ensure mutual success.
Overview
This project covered a 35-mile segment of Amtrak’s west rail line, extending from Kalamazoo to Porter.
Scope of Work
Modern Railway Systems (MRS) installed new wayside signal system equipment, upgrading nine intermediate signals and one electric lock location. The work included deploying new signal and fiber network cabling, enhancing existing fiber optic infrastructure, and installing new signal houses and signals. MRS also performed comprehensive fiber optic testing and worked closely with the prime contractor and owner to complete successful cutover testing and full system integration.
Kalamazoo, MI to Porter, IN
Passenger & Freight Rail
Design-Build
2020
Amtrak
Central