CapMetro PTC Optimization
Optimizing safer systems for more efficient travel.
Optimizing safer systems for more efficient travel.
This project augmented the original PTC project completed by MRS. For the optimization phase, MRS focused on the ongoing enhancement of the E-ATC PTC system through technical oversight, design, installation, and construction on new or existing rail assets. This included upgrades at at-grade crossings, sidings, and main tracks within the existing PTC corridor, ensuring a fully integrated and optimized system. Additionally, MRS conducted thorough headway and throughput analysis to maximize the efficiency and performance of the rail network.
Austin, TX
Commuter Rail
Design-Build
2027
Capital Metropolitan Transportation Authority
Central